SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/06 00:00 0.00 25.34 81400 12.91
06/06 01:00 0.00 25.31 81100 12.90
06/06 02:00 0.00 25.19 79900 12.90
06/06 03:00 0.00 25.19 79900 12.89
06/06 04:00 0.00 25.09 78900 12.87
06/06 05:00 0.00 25.03 78300 12.86
06/06 06:00 0.00 25.00 78000 12.87
06/06 07:00 0.00 24.87 76960 13.04
06/06 08:00 0.00 24.84 76720 13.26
06/06 09:00 0.00 24.81 76480 13.38
06/06 10:00 0.00 24.81 76480 13.06
06/06 11:00 0.00 24.69 75520 13.06
06/06 12:00 0.00 24.78 76240 13.07
06/06 13:00 0.00 24.71 75680 13.09
06/06 14:00 0.00 24.66 75280 13.09
06/06 15:00 0.00 24.62 74960 13.09
06/06 16:00 0.00 24.50 74000 13.09
06/06 17:00 0.00 24.45 73600 13.06
06/06 18:00 0.00 24.39 73120 13.08
06/06 19:00 0.00 24.43 73440 12.97
06/06 20:00 0.00 24.40 73200 12.95
06/06 21:00 0.00 24.36 72880 12.93
06/06 22:00 0.00 24.33 72640 12.92
06/06 23:00 0.00 24.36 72880 12.93
Data processed at Sat 07Jun2025 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.