SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/09 00:00 0.00 13.57 1108 12.99
09/09 01:00 0.00 13.58 1152 12.97
09/09 02:00 0.00 13.50 800 12.96
09/09 03:00 0.00 13.60 1240 12.95
09/09 04:00 0.00 13.62 1328 12.93
09/09 05:00 0.00 13.62 1328 12.92
09/09 06:00 0.00 13.62 1328 12.90
09/09 07:00 0.00 13.63 1372 13.10
09/09 08:00 0.00 13.63 1372 13.71
09/09 09:00 0.00 13.56 1064 14.38
09/09 10:00 0.00 13.64 1416 13.19
09/09 11:00 0.00 13.53 932 13.16
09/09 12:00 0.00 13.54 976 13.13
09/09 13:00 0.00 13.62 1328 13.13
09/09 14:00 0.00 13.60 1240 14.14
09/09 15:00 0.00 13.66 1504 14.04
09/09 16:00 0.00 13.56 1064 13.95
09/09 17:00 0.00 13.67 1548 13.59
09/09 18:00 0.00 13.58 1152 13.17
09/09 19:00 0.00 13.64 1416 13.03
09/09 20:00 0.00 13.66 1504 13.01
09/09 21:00 0.00 13.67 1548 13.01
09/09 22:00 0.00 13.66 1504 13.01
09/09 23:00 ---- ---- ---- ----
Data processed at Tue 10Sep2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.