SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/03 00:00 0.00 13.47 800 13.00
09/03 01:00 0.00 13.49 800 12.99
09/03 02:00 0.00 13.48 800 12.98
09/03 03:00 0.00 13.59 1196 12.98
09/03 04:00 0.00 13.53 932 12.96
09/03 05:00 0.00 13.55 1020 12.94
09/03 06:00 0.00 13.61 1284 12.93
09/03 07:00 0.00 13.56 1064 13.11
09/03 08:00 0.00 13.51 844 13.53
09/03 09:00 0.00 13.49 800 13.95
09/03 10:00 0.00 13.51 844 13.78
09/03 11:00 0.00 13.51 844 14.18
09/03 12:00 0.00 13.54 976 14.18
09/03 13:00 0.00 13.54 976 14.00
09/03 14:00 0.00 13.56 1064 13.87
09/03 15:00 0.00 13.51 844 13.65
09/03 16:00 0.00 13.52 888 13.46
09/03 17:00 0.00 13.58 1152 13.21
09/03 18:00 0.00 13.58 1152 13.07
09/03 19:00 0.00 13.53 932 13.03
09/03 20:00 0.00 13.61 1284 13.03
09/03 21:00 0.00 13.58 1152 13.02
09/03 22:00 0.00 13.61 1284 13.03
09/03 23:00 ---- ---- ---- ----
Data processed at Wed 04Sep2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.