SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/23 00:00 0.00 13.44 800 13.00
08/23 01:00 0.00 13.49 800 12.98
08/23 02:00 0.00 13.53 932 12.96
08/23 03:00 0.00 13.42 800 12.95
08/23 04:00 0.00 13.47 800 12.93
08/23 05:00 0.00 13.45 800 12.91
08/23 06:00 0.00 13.49 800 12.90
08/23 07:00 0.00 13.45 800 13.03
08/23 08:00 0.00 13.45 800 13.59
08/23 09:00 0.00 13.50 800 13.46
08/23 10:00 0.00 13.47 800 13.59
08/23 11:00 0.00 13.52 888 13.23
08/23 12:00 0.00 13.46 800 14.11
08/23 13:00 0.00 13.52 888 13.86
08/23 14:00 0.00 13.42 800 14.06
08/23 15:00 0.00 13.51 844 13.99
08/23 16:00 0.00 13.44 800 13.87
08/23 17:00 0.00 13.48 800 13.62
08/23 18:00 0.00 13.47 800 13.24
08/23 19:00 0.00 13.54 976 13.03
08/23 20:00 0.00 13.52 888 13.03
08/23 21:00 0.00 13.53 932 13.02
08/23 22:00 0.00 13.52 888 13.03
08/23 23:00 ---- ---- ---- ----
Data processed at Sat 24Aug2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.