SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/19 00:00 0.00 13.50 800 12.96
08/19 01:00 0.00 13.60 1240 12.95
08/19 02:00 0.00 13.60 1240 12.94
08/19 03:00 0.00 13.63 1372 12.93
08/19 04:00 0.00 13.66 1504 12.90
08/19 05:00 0.00 13.65 1460 12.90
08/19 06:00 0.00 13.57 1108 12.88
08/19 07:00 0.00 13.63 1372 12.88
08/19 08:00 0.00 13.59 1196 12.86
08/19 09:00 0.00 13.62 1328 12.90
08/19 10:00 0.00 13.58 1152 13.00
08/19 11:00 0.00 13.66 1504 13.41
08/19 12:00 0.00 13.60 1240 13.70
08/19 13:00 0.00 13.58 1152 14.15
08/19 14:00 0.00 13.57 1108 14.05
08/19 15:00 0.00 13.59 1196 13.96
08/19 16:00 0.00 13.52 888 13.86
08/19 17:00 0.00 13.66 1504 13.69
08/19 18:00 0.00 13.65 1460 13.32
08/19 19:00 0.00 13.55 1020 13.03
08/19 20:00 0.00 13.54 976 13.03
08/19 21:00 0.00 13.55 1020 13.03
08/19 22:00 0.00 13.54 976 13.03
08/19 23:00 ---- ---- ---- ----
Data processed at Tue 20Aug2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.