SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/07 00:00 0.00 13.80 2120 12.99
08/07 01:00 0.00 13.78 2032 12.98
08/07 02:00 0.00 13.76 1944 12.96
08/07 03:00 0.00 13.76 1944 12.94
08/07 04:00 0.00 13.75 1900 12.93
08/07 05:00 0.00 13.74 1856 12.90
08/07 06:00 0.00 13.73 1812 12.90
08/07 07:00 0.00 13.72 1768 13.14
08/07 08:00 0.00 13.69 1636 13.55
08/07 09:00 0.00 13.67 1548 13.74
08/07 10:00 0.00 13.65 1460 14.12
08/07 11:00 0.00 13.64 1416 14.14
08/07 12:00 0.00 13.62 1328 14.11
08/07 13:00 0.00 13.58 1152 14.06
08/07 14:00 0.00 13.58 1152 13.98
08/07 15:00 0.00 13.57 1108 13.91
08/07 16:00 0.00 13.52 888 13.77
08/07 17:00 0.00 13.38 800 13.62
08/07 18:00 0.00 13.52 888 13.32
08/07 19:00 0.00 13.51 844 13.03
08/07 20:00 0.00 13.51 844 13.03
08/07 21:00 0.00 13.51 844 13.03
08/07 22:00 0.00 13.51 844 13.03
08/07 23:00 ---- ---- ---- ----
Data processed at Thu 08Aug2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.