SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/31 00:00 0.00 14.00 3000 12.98
07/31 01:00 0.00 13.94 2736 12.96
07/31 02:00 0.00 13.94 2736 12.96
07/31 03:00 0.00 13.94 2736 12.94
07/31 04:00 0.00 13.96 2824 12.93
07/31 05:00 0.00 13.97 2868 12.93
07/31 06:00 0.00 13.99 2956 12.93
07/31 07:00 0.00 13.97 2868 13.19
07/31 08:00 0.00 13.78 2032 13.57
07/31 09:00 0.00 13.85 2340 13.89
07/31 10:00 0.00 13.84 2296 14.43
07/31 11:00 0.00 13.69 1636 14.28
07/31 12:00 0.00 13.74 1856 14.18
07/31 13:00 0.00 13.66 1504 14.17
07/31 14:00 0.00 13.76 1944 14.08
07/31 15:00 0.00 13.59 1196 13.98
07/31 16:00 0.00 13.62 1328 13.88
07/31 17:00 0.00 13.64 1416 13.68
07/31 18:00 0.00 13.64 1416 13.42
07/31 19:00 0.00 13.64 1416 13.03
07/31 20:00 0.00 13.62 1328 13.01
07/31 21:00 0.00 13.64 1416 13.03
07/31 22:00 0.00 13.62 1328 13.01
07/31 23:00 ---- ---- ---- ----
Data processed at Thu 01Aug2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.