SSBO2: Sab Bois Creek S of Stigler Ok

                                SHEF ID:       SSBO2     Sab Bois Creek S of Stigler Ok
STATION TYPE:
Regulating: Stage = 26.00, Flow = 4359

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/30 00:00 0.00 11.73 231 12.79 12.50
04/30 01:00 0.00 11.71 228 12.78 12.49
04/30 02:00 0.13 11.72 230 12.77 12.48
04/30 03:00 0.03 11.70 227 12.75 12.46
04/30 04:00 0.00 11.69 225 12.73 12.43
04/30 05:00 0.01 11.69 225 12.71 12.41
04/30 06:00 0.00 11.70 227 12.70 12.40
04/30 07:00 0.00 11.71 228 12.68 12.38
04/30 08:00 0.00 11.73 231 13.20 12.84
04/30 09:00 0.00 11.75 234 14.14 13.44
04/30 10:00 0.00 11.77 237 13.97 13.30
04/30 11:00 0.00 11.80 241 14.06 13.16
04/30 12:00 0.02 11.86 249 13.13 12.86
04/30 13:00 0.75 12.23 305 12.94 12.65
04/30 14:00 0.22 12.83 413 12.88 12.60
04/30 15:00 0.31 13.75 617 12.87 12.57
04/30 16:00 0.15 14.97 950 12.96 12.67
04/30 17:00 0.00 16.50 1328 13.30 12.98
04/30 18:00 0.00 18.57 1796 13.40 13.06
04/30 19:00 0.00 20.71 2328 13.24 12.96
04/30 20:00 ---- ---- ---- ---- ----
04/30 21:00 ---- ---- ---- ---- ----
04/30 22:00 ---- ---- ---- ---- ----
04/30 23:00 ---- ---- ---- ---- ----
Data processed at Thu 01May2025 00:58 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
STIG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
STIG.Stage.Inst.1Hour.0.Ccp-Rev
STIG.Flow.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.