SSBO2: Sab Bois Creek S of Stigler Ok

                                SHEF ID:       SSBO2     Sab Bois Creek S of Stigler Ok
STATION TYPE:
Regulating: Stage = 26.00, Flow = 4359

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/25 00:00 0.00 11.53 190 12.80 12.51
04/25 01:00 0.00 11.51 185 12.77 12.47
04/25 02:00 0.00 11.48 179 12.77 12.48
04/25 03:00 0.00 11.46 174 12.75 12.47
04/25 04:00 0.00 11.44 170 12.73 12.44
04/25 05:00 0.00 11.42 165 12.71 12.42
04/25 06:00 0.00 11.40 161 12.69 12.40
04/25 07:00 0.00 11.39 159 12.69 12.40
04/25 08:00 0.00 11.39 159 13.22 12.83
04/25 09:00 0.00 11.39 159 14.11 13.42
04/25 10:00 0.00 11.40 161 13.53 13.25
04/25 11:00 0.00 11.42 165 13.35 12.96
04/25 12:00 0.00 11.43 168 13.35 12.96
04/25 13:00 0.00 11.45 172 13.33 12.93
04/25 14:00 0.00 11.43 168 13.33 12.96
04/25 15:00 0.00 11.45 172 13.21 12.86
04/25 16:00 0.00 11.45 172 13.02 12.73
04/25 17:00 0.00 11.44 170 12.97 12.65
04/25 18:00 0.00 11.42 165 12.99 12.63
04/25 19:00 0.00 11.41 163 13.03 12.71
04/25 20:00 0.00 11.39 159 12.88 12.58
04/25 21:00 0.00 11.38 157 12.83 12.54
04/25 22:00 0.00 11.36 153 12.80 12.52
04/25 23:00 0.00 11.34 149 12.80 12.50
Data processed at Sat 26Apr2025 04:58 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
STIG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
STIG.Stage.Inst.1Hour.0.Ccp-Rev
STIG.Flow.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.