SSBO2: Sab Bois Creek S of Stigler Ok

                                SHEF ID:       SSBO2     Sab Bois Creek S of Stigler Ok
STATION TYPE:
Regulating: Stage = 26.00, Flow = 4359

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/14 00:00 0.00 11.07 102 12.71 12.44
01/14 01:00 0.00 11.11 108 12.69 12.41
01/14 02:00 0.00 11.14 113 12.65 12.36
01/14 03:00 0.00 11.18 119 12.65 12.36
01/14 04:00 0.00 11.22 126 12.63 12.34
01/14 05:00 0.00 11.25 132 12.62 12.34
01/14 06:00 0.00 11.27 135 12.61 12.31
01/14 07:00 0.00 11.30 141 12.61 12.31
01/14 08:00 0.00 11.31 143 12.67 12.36
01/14 09:00 0.00 11.32 145 13.83 13.28
01/14 10:00 0.00 11.33 147 14.61 13.65
01/14 11:00 0.00 11.33 147 14.42 13.73
01/14 12:00 0.00 11.33 147 13.78 13.36
01/14 13:00 0.00 11.32 145 13.69 13.11
01/14 14:00 0.00 11.32 145 13.69 13.10
01/14 15:00 0.00 11.32 145 13.54 13.01
01/14 16:00 0.00 11.32 145 13.53 12.94
01/14 17:00 0.00 11.32 145 13.15 12.88
01/14 18:00 0.00 11.33 147 12.94 12.69
01/14 19:00 0.00 11.34 149 12.88 12.63
01/14 20:00 0.00 11.36 153 12.84 12.59
01/14 21:00 0.00 11.39 159 12.80 12.53
01/14 22:00 0.00 11.44 170 12.77 12.50
01/14 23:00 0.00 11.51 185 12.75 12.48
Data processed at Wed 15Jan2025 05:58 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
STIG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
STIG.Stage.Inst.1Hour.0.Ccp-Rev
STIG.Flow.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery.Inst.1Hour.0.Ccp-Rev
STIG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.