Downstream station:
SHEF ID: SFRO2 Stillwater Fairgrounds RD
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
07/28 00:00 0.00 5.23 3 12.73 12.65
07/28 01:00 0.00 5.29 4 12.73 12.65
07/28 02:00 0.00 5.21 3 12.73 12.65
07/28 03:00 0.00 5.02 0 12.73 12.65
07/28 04:00 0.00 5.24 4 12.73 12.57
07/28 05:00 0.00 5.23 3 12.65 12.57
07/28 06:00 0.00 6.86 137 12.65 12.57
07/28 07:00 0.00 5.28 4 12.65 12.57
07/28 08:00 0.00 5.12 2 12.65 12.57
07/28 09:00 0.00 5.20 3 12.65 12.57
07/28 10:00 0.00 5.07 1 12.73 12.57
07/28 11:00 0.00 5.25 4 13.13 12.97
07/28 12:00 0.00 5.09 1 13.92 13.21
07/28 13:00 0.00 5.05 1 13.68 13.05
07/28 14:00 0.00 5.12 2 13.68 12.97
07/28 15:00 0.00 5.08 1 13.92 12.89
07/28 16:00 0.00 6.00 31 13.92 12.81
07/28 17:00 0.00 6.72 113 14.24 12.89
07/28 18:00 0.00 5.10 1 12.89 12.81
07/28 19:00 0.00 5.14 2 12.81 12.73
07/28 20:00 0.00 5.12 2 12.81 12.73
07/28 21:00 0.00 5.19 3 12.81 12.65
07/28 22:00 0.00 5.17 3 12.81 12.65
07/28 23:00 ---- ---- ---- ---- ----