Downstream station:
SHEF ID: SFRO2 Stillwater Fairgrounds RD
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
06/23 00:00 0.00 5.20 3 12.73 12.65
06/23 01:00 0.00 5.23 3 12.73 12.57
06/23 02:00 0.00 5.20 3 12.73 12.57
06/23 03:00 0.00 5.21 3 12.65 12.57
06/23 04:00 0.00 5.22 3 12.65 12.57
06/23 05:00 0.00 5.25 4 12.65 12.57
06/23 06:00 0.00 5.23 3 12.65 12.57
06/23 07:00 0.00 5.23 3 12.65 12.57
06/23 08:00 0.00 5.27 4 12.65 12.57
06/23 09:00 0.00 5.20 3 12.73 12.65
06/23 10:00 0.00 5.27 4 12.81 12.65
06/23 11:00 0.00 5.18 3 12.97 12.81
06/23 12:00 0.00 5.24 4 13.13 12.97
06/23 13:00 0.00 5.20 3 13.60 13.05
06/23 14:00 0.00 5.23 3 13.84 12.89
06/23 15:00 0.00 5.23 3 13.53 12.81
06/23 16:00 0.00 5.24 4 14.16 12.89
06/23 17:00 0.00 5.18 3 13.53 12.81
06/23 18:00 0.00 5.30 4 12.81 12.73
06/23 19:00 0.00 5.24 4 12.81 12.65
06/23 20:00 0.00 5.21 3 12.73 12.65
06/23 21:00 0.00 5.21 3 12.73 12.65
06/23 22:00 0.00 5.21 3 12.73 12.65
06/23 23:00 ---- ---- ---- ---- ----