Downstream station:
    
SHEF ID:       SFRO2     Stillwater Fairgrounds RD
STATION TYPE:  
               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
06/23 00:00      0.00      5.52         8     12.73     12.57
06/23 01:00      0.00      5.51         8     12.73     12.57
06/23 02:00      0.00      5.50         7     12.73     12.57
06/23 03:00      0.00      5.47         7     12.73     12.57
06/23 04:00      0.00      5.48         7     12.65     12.57
06/23 05:00      0.00      5.46         7     12.65     12.57
06/23 06:00      0.00      5.44         7     12.65     12.49
06/23 07:00      0.00      5.45         7     12.65     12.49
06/23 08:00      0.00      5.46         7     12.65     12.49
06/23 09:00      0.00      5.43         6     12.81     12.65
06/23 10:00      0.00      5.39         6     13.05     12.89
06/23 11:00      0.00      5.41         6     13.37     13.21
06/23 12:00      0.00      5.46         7     13.60     13.37
06/23 13:00      0.00      5.45         7     13.53     13.29
06/23 14:00      0.00      5.37         5     13.92     13.21
06/23 15:00      0.00      5.39         6     14.08     13.13
06/23 16:00      0.00      5.44         7     14.16     13.13
06/23 17:00      0.00      5.47         7     13.84     13.21
06/23 18:00      0.00      5.45         7     13.13     12.97
06/23 19:00      0.00      5.47         7     12.97     12.81
06/23 20:00      0.00      5.50         7     12.81     12.73
06/23 21:00      0.00      5.49         7     12.81     12.65
06/23 22:00      0.00      5.48         7     12.81     12.65
06/23 23:00      0.00      5.49         7     12.81     12.65