Downstream station:
SHEF ID: SFRO2 Stillwater Fairgrounds RD
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
04/17 00:00 0.00 6.70 127 12.65 12.49
04/17 01:00 0.00 6.71 128 12.65 12.57
04/17 02:00 0.00 6.72 129 12.65 12.57
04/17 03:00 0.00 6.70 127 12.65 12.57
04/17 04:00 0.00 6.68 125 12.65 12.49
04/17 05:00 0.00 6.68 125 12.65 12.49
04/17 06:00 0.00 6.66 123 12.65 12.49
04/17 07:00 0.00 6.66 123 12.65 12.49
04/17 08:00 0.00 6.63 120 12.65 12.49
04/17 09:00 0.00 6.60 117 12.97 12.73
04/17 10:00 0.00 6.62 119 13.37 13.21
04/17 11:00 0.00 6.58 114 13.37 13.29
04/17 12:00 0.00 6.58 114 13.68 13.29
04/17 13:00 0.00 6.57 113 13.53 13.37
04/17 14:00 0.00 6.57 113 13.68 13.60
04/17 15:00 0.00 6.55 111 13.84 13.68
04/17 16:00 0.00 6.53 109 13.68 13.53
04/17 17:00 0.00 6.53 109 13.76 13.53
04/17 18:00 0.00 6.50 106 13.44 13.44
04/17 19:00 0.00 6.50 106 13.21 13.13
04/17 20:00 0.00 6.49 105 13.05 12.89
04/17 21:00 0.00 6.48 104 12.97 12.81
04/17 22:00 0.00 6.47 103 12.89 12.81
04/17 23:00 ---- ---- ---- ---- ----