Upstream stations:
Downstream station:
SHEF ID: SEDK1 L ARKANSAS R NR SEDGWICK, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 12050
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/11 00:00 0.00 2.31 9 11.77
09/11 01:00 0.00 2.32 10 11.77
09/11 02:00 0.00 2.32 10 11.77
09/11 03:00 0.00 2.31 9 11.77
09/11 04:00 0.00 2.31 9 11.77
09/11 05:00 0.00 2.31 9 11.77
09/11 06:00 0.00 2.31 9 11.77
09/11 07:00 0.00 2.30 9 11.77
09/11 08:00 0.00 2.30 9 11.77
09/11 09:00 0.00 2.30 9 12.09
09/11 10:00 0.00 2.30 9 11.93
09/11 11:00 0.00 2.30 9 13.13
09/11 12:00 0.00 2.30 9 13.29
09/11 13:00 0.00 2.30 9 13.60
09/11 14:00 0.00 2.29 9 13.60
09/11 15:00 0.00 2.29 9 13.76
09/11 16:00 0.00 2.29 9 13.68
09/11 17:00 0.00 2.29 9 13.53
09/11 18:00 0.00 2.29 9 13.37
09/11 19:00 0.00 2.29 9 13.21
09/11 20:00 0.00 2.29 9 12.41
09/11 21:00 0.00 2.29 9 12.09
09/11 22:00 0.00 2.29 9 12.09
09/11 23:00 0.00 2.29 9 12.09