Upstream stations:
Downstream station:
SHEF ID: SEDK1 L ARKANSAS R NR SEDGWICK, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 12050
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
08/30 00:00 0.00 2.32 10 12.09
08/30 01:00 0.00 2.32 10 12.01
08/30 02:00 0.00 2.31 9 12.01
08/30 03:00 0.00 2.31 9 12.01
08/30 04:00 0.00 2.30 9 12.01
08/30 05:00 0.00 2.30 9 11.93
08/30 06:00 0.00 2.30 9 11.93
08/30 07:00 0.00 2.30 9 11.93
08/30 08:00 0.00 2.29 9 11.93
08/30 09:00 0.00 2.29 9 11.37
08/30 10:00 0.00 2.29 9 12.65
08/30 11:00 0.00 2.28 8 13.05
08/30 12:00 0.00 2.29 9 13.29
08/30 13:00 0.00 2.28 8 13.68
08/30 14:00 0.00 2.29 9 13.53
08/30 15:00 0.00 2.27 8 13.53
08/30 16:00 0.00 2.28 8 13.60
08/30 17:00 0.00 2.27 8 13.37
08/30 18:00 0.00 2.27 8 13.29
08/30 19:00 0.00 2.27 8 13.13
08/30 20:00 0.00 2.27 8 12.41
08/30 21:00 0.00 2.27 8 12.09
08/30 22:00 0.00 2.27 8 12.09
08/30 23:00 0.00 2.27 8 12.09