Downstream station:
SHEF ID: PYRO2 Pryor Creek
STATION TYPE:
Regulating: Stage = 21.00, Flow = 3244
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
07/20 00:00 0.00 5.37 0 12.73 12.65
07/20 01:00 0.00 5.40 0 12.73 12.65
07/20 02:00 0.00 5.40 0 12.73 12.65
07/20 03:00 0.00 5.38 0 12.73 12.65
07/20 04:00 0.00 5.40 0 12.73 12.65
07/20 05:00 0.00 5.41 0 12.73 12.65
07/20 06:00 0.00 5.39 0 12.73 12.65
07/20 07:00 0.00 5.39 0 12.81 12.65
07/20 08:00 0.00 5.38 0 12.97 12.73
07/20 09:00 0.00 5.41 0 13.29 13.13
07/20 10:00 0.00 5.25 0 13.53 13.29
07/20 11:00 0.00 5.34 0 13.29 13.13
07/20 12:00 0.00 5.20 0 12.97 12.89
07/20 13:00 0.00 5.21 0 12.97 12.89
07/20 14:00 0.00 5.30 0 12.97 12.89
07/20 15:00 0.00 5.37 0 12.97 12.89
07/20 16:00 0.00 5.31 0 12.89 12.81
07/20 17:00 0.00 5.26 0 12.89 12.81
07/20 18:00 0.00 5.28 0 12.89 12.73
07/20 19:00 0.00 5.30 0 12.81 12.73
07/20 20:00 0.00 5.29 0 12.89 12.81
07/20 21:00 0.00 5.29 0 12.81 12.73
07/20 22:00 0.00 5.36 0 12.81 12.73
07/20 23:00 0.00 5.31 0 12.81 12.65