Downstream station:
SHEF ID: PYRO2 Pryor Creek
STATION TYPE:
Regulating: Stage = 21.00, Flow = 3244
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
07/06 00:00 0.00 5.47 0 12.73 12.65
07/06 01:00 0.00 5.41 0 12.73 12.65
07/06 02:00 0.00 5.40 0 12.73 12.65
07/06 03:00 0.00 5.36 0 12.73 12.65
07/06 04:00 0.00 5.43 0 12.73 12.65
07/06 05:00 0.00 5.45 0 12.73 12.65
07/06 06:00 0.00 5.45 0 12.73 12.57
07/06 07:00 0.00 5.41 0 12.81 12.65
07/06 08:00 0.00 5.41 0 12.97 12.73
07/06 09:00 0.00 5.42 0 13.29 13.05
07/06 10:00 0.00 5.45 0 13.37 13.21
07/06 11:00 0.00 5.45 0 13.29 13.05
07/06 12:00 0.00 5.41 0 12.97 12.89
07/06 13:00 0.00 5.44 0 12.97 12.81
07/06 14:00 0.00 5.44 0 12.97 12.89
07/06 15:00 0.00 5.47 0 12.97 12.89
07/06 16:00 0.00 5.46 0 12.89 12.81
07/06 17:00 0.00 5.48 0 12.89 12.81
07/06 18:00 0.00 5.46 0 12.89 12.73
07/06 19:00 0.00 5.47 0 12.81 12.73
07/06 20:00 0.00 5.49 0 12.97 12.81
07/06 21:00 0.00 5.48 0 12.81 12.73
07/06 22:00 0.00 5.46 0 12.81 12.73
07/06 23:00 0.00 5.46 0 12.81 12.65