PTAO2: Poteau River, Poteau, OK

                                SHEF ID:       PTAO2     Poteau River at Poteau, OK
STATION TYPE:
Regulating: Stage = 20.00, Flow = 7395

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/18 00:00 0.00 8.62 2358 12.89 12.43
06/18 01:00 0.00 8.58 2344 12.88 12.42
06/18 02:00 0.00 8.53 2326 12.86 12.40
06/18 03:00 0.08 8.50 2315 12.84 12.38
06/18 04:00 0.07 8.46 2301 12.83 12.36
06/18 05:00 0.30 8.48 2308 12.82 12.36
06/18 06:00 0.08 8.53 2326 12.80 12.34
06/18 07:00 0.11 8.56 2337 12.84 12.34
06/18 08:00 0.04 8.63 2362 13.06 12.56
06/18 09:00 0.07 8.73 2398 13.23 12.70
06/18 10:00 0.03 8.86 2444 13.39 12.82
06/18 11:00 0.03 9.02 2502 13.29 12.86
06/18 12:00 0.01 9.26 2589 14.12 13.16
06/18 13:00 0.00 9.52 2683 13.44 12.99
06/18 14:00 0.00 9.74 2763 13.29 12.85
06/18 15:00 0.00 9.94 2835 13.17 12.74
06/18 16:00 0.00 10.13 2905 13.16 12.67
06/18 17:00 0.00 10.27 2956 13.16 12.63
06/18 18:00 0.00 10.39 3000 13.11 12.61
06/18 19:00 0.00 10.46 3026 13.22 12.61
06/18 20:00 0.00 10.50 3040 13.33 12.62
06/18 21:00 0.00 10.51 3044 12.99 12.54
06/18 22:00 0.00 10.46 3026 12.93 12.47
06/18 23:00 0.00 10.43 3015 12.91 12.45
Data processed at Thu 19Jun2025 04:48 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
POTE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
POTE.Stage.Inst.1Hour.0.Ccp-Rev
POTE.Flow.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.