PTAO2: Poteau River, Poteau, OK

                                
SHEF ID:       PTAO2     Poteau River at Poteau, OK
STATION TYPE:  
Regulating: Stage =    20.00, Flow =     7385

               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
07/11 00:00      0.00      2.91       241     12.83     12.53
07/11 01:00      0.00      2.90       238     12.81     12.51
07/11 02:00      0.00      2.89       235     12.80     12.50
07/11 03:00      0.00      2.88       232     12.80     12.49
07/11 04:00      0.00      2.87       229     12.79     12.48
07/11 05:00      0.00      2.86       227     12.77     12.47
07/11 06:00      0.00      2.86       227     12.76     12.46
07/11 07:00      0.00      2.85       224     12.76     12.44
07/11 08:00      0.94      2.95       252     12.74     12.44
07/11 09:00      0.98      4.22       720     12.73     12.44
07/11 10:00      0.10      4.72       938     12.84     12.48
07/11 11:00      0.04      4.95      1037     13.36     12.89
07/11 12:00      0.00      5.06      1076     14.29     13.42
07/11 13:00      0.01      5.21      1131     14.10     13.23
07/11 14:00      0.00      5.34      1180     13.49     13.19
07/11 15:00      0.00      5.41      1206     13.45     13.13
07/11 16:00      0.00      5.44      1217     14.12     13.14
07/11 17:00      0.00      5.42      1209     13.42     13.12
07/11 18:00      0.00      5.36      1187     13.49     13.10
07/11 19:00      0.00      5.26      1150     14.22     13.16
07/11 20:00      0.00      5.13      1102     13.13     12.88
07/11 21:00      0.00      4.98      1047     12.93     12.64
07/11 22:00      0.00      4.80       975     12.88     12.58
07/11 23:00      0.00      4.61       888     12.86     12.56

                            
Data processed at Wed 12Jul2023 04:55 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
POTE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
POTE.Stage.Inst.1Hour.0.Ccp-Rev
POTE.Flow.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.