PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/30 00:00 0.00 ---- 15.54 11972 12.48
06/30 01:00 0.02 ---- 15.58 12035 12.44
06/30 02:00 0.02 ---- 15.61 12082 12.44
06/30 03:00 0.00 ---- 15.67 12176 12.44
06/30 04:00 0.00 ---- 15.68 12192 12.43
06/30 05:00 0.00 ---- 15.75 12302 12.40
06/30 06:00 0.00 ---- 15.80 12381 12.40
06/30 07:00 0.00 ---- 15.81 12397 12.36
06/30 08:00 0.00 ---- 15.87 12492 12.37
06/30 09:00 0.00 ---- 15.89 12523 12.40
06/30 10:00 0.00 ---- 15.90 12539 12.37
06/30 11:00 0.00 ---- 15.94 12602 12.71
06/30 12:00 0.00 ---- 15.98 12665 13.05
06/30 13:00 0.00 ---- 16.01 12713 13.39
06/30 14:00 0.01 ---- 16.00 12697 13.43
06/30 15:00 0.00 ---- 16.02 12729 13.21
06/30 16:00 0.00 ---- 16.05 12776 13.22
06/30 17:00 0.00 ---- 16.04 12760 13.13
06/30 18:00 0.00 ---- 16.05 12776 12.93
06/30 19:00 0.00 ---- 16.06 12792 12.65
06/30 20:00 0.00 ---- 16.05 12776 12.60
06/30 21:00 0.00 ---- 16.07 12808 12.57
06/30 22:00 0.00 ---- 16.06 12792 12.53
06/30 23:00 0.00 ---- 16.05 12776 12.51
Data processed at Tue 01Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.