PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/27 00:00 0.14 ---- 15.11 11298 12.47
06/27 01:00 0.01 ---- 15.12 11314 12.44
06/27 02:00 0.00 ---- 15.10 11283 12.40
06/27 03:00 0.00 ---- 15.10 11283 12.40
06/27 04:00 0.00 ---- 15.11 11298 12.39
06/27 05:00 0.00 ---- 15.09 11267 12.37
06/27 06:00 0.00 ---- 15.08 11251 12.36
06/27 07:00 0.00 ---- 15.08 11251 12.33
06/27 08:00 0.00 ---- 15.07 11236 12.37
06/27 09:00 0.00 ---- 15.08 11251 12.40
06/27 10:00 0.00 ---- 15.07 11236 12.99
06/27 11:00 0.00 ---- 15.05 11205 13.05
06/27 12:00 0.00 ---- 15.07 11236 12.96
06/27 13:00 0.00 ---- 15.05 11205 12.71
06/27 14:00 0.00 ---- 15.05 11205 13.07
06/27 15:00 0.00 ---- 15.04 11189 12.76
06/27 16:00 0.00 ---- 15.04 11189 12.85
06/27 17:00 0.00 ---- 15.06 11220 12.90
06/27 18:00 0.00 ---- 15.03 11173 12.57
06/27 19:00 0.00 ---- 15.04 11189 12.53
06/27 20:00 0.00 ---- 15.04 11189 12.50
06/27 21:00 0.00 ---- 15.06 11220 12.47
06/27 22:00 0.00 ---- 15.05 11205 12.44
06/27 23:00 0.00 ---- 15.03 11173 12.41
Data processed at Sat 28Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.