PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/12 00:00 0.00 ---- 15.65 12145 12.46
06/12 01:00 0.00 ---- 15.63 12113 12.45
06/12 02:00 0.00 ---- 15.65 12145 12.44
06/12 03:00 0.00 ---- 15.64 12129 12.40
06/12 04:00 0.01 ---- 15.64 12129 12.40
06/12 05:00 0.01 ---- 15.59 12051 12.37
06/12 06:00 0.02 ---- 15.61 12082 12.36
06/12 07:00 0.03 ---- 15.58 12035 12.36
06/12 08:00 0.01 ---- 15.59 12051 12.37
06/12 09:00 0.00 ---- 15.58 12035 12.37
06/12 10:00 0.01 ---- 15.54 11972 13.07
06/12 11:00 0.00 ---- 15.57 12019 12.86
06/12 12:00 0.00 ---- 15.57 12019 12.86
06/12 13:00 0.00 ---- 15.58 12035 12.71
06/12 14:00 0.00 ---- 15.56 12003 12.87
06/12 15:00 0.00 ---- 15.56 12003 12.98
06/12 16:00 0.09 ---- 15.55 11988 13.17
06/12 17:00 0.34 ---- 15.55 11988 12.68
06/12 18:00 0.00 ---- 15.54 11972 12.74
06/12 19:00 0.00 ---- 15.53 11956 12.61
06/12 20:00 0.00 ---- 15.60 12066 12.53
06/12 21:00 0.00 ---- 15.60 12066 12.50
06/12 22:00 0.00 ---- 15.58 12035 12.47
06/12 23:00 0.00 ---- 15.62 12098 12.44
Data processed at Fri 13Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.