PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/10 00:00 0.00 ---- 15.96 12634 12.46
06/10 01:00 0.00 ---- 15.98 12665 12.42
06/10 02:00 0.00 ---- 15.96 12634 12.43
06/10 03:00 0.00 ---- 15.98 12665 12.39
06/10 04:00 0.00 ---- 15.97 12650 12.37
06/10 05:00 0.00 ---- 15.99 12681 12.37
06/10 06:00 0.00 ---- 15.96 12634 12.36
06/10 07:00 0.00 ---- 15.97 12650 12.33
06/10 08:00 0.00 ---- 16.01 12713 12.36
06/10 09:00 0.00 ---- 16.00 12697 12.69
06/10 10:00 0.00 ---- 15.98 12665 13.03
06/10 11:00 0.00 ---- 15.99 12681 13.28
06/10 12:00 0.00 ---- 15.97 12650 13.52
06/10 13:00 0.00 ---- 15.98 12665 13.42
06/10 14:00 0.00 ---- 16.01 12713 13.18
06/10 15:00 0.00 ---- 15.98 12665 13.06
06/10 16:00 0.00 ---- 15.99 12681 13.05
06/10 17:00 0.00 ---- 15.97 12650 13.05
06/10 18:00 0.00 ---- 15.98 12665 12.99
06/10 19:00 0.00 ---- 15.96 12634 12.75
06/10 20:00 0.00 ---- 15.95 12618 12.60
06/10 21:00 0.00 ---- 15.97 12650 12.56
06/10 22:00 0.00 ---- 15.96 12634 12.53
06/10 23:00 0.00 ---- 15.96 12634 12.47
Data processed at Wed 11Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.