PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/26 00:00 0.00 ---- 11.70 5838 12.46
06/26 01:00 0.00 ---- 11.73 5888 12.44
06/26 02:00 0.00 ---- 11.77 5955 12.43
06/26 03:00 0.07 ---- 11.78 5971 12.40
06/26 04:00 0.24 ---- 11.78 5971 12.38
06/26 05:00 0.57 ---- 11.76 5938 12.37
06/26 06:00 0.90 ---- 11.77 5955 12.34
06/26 07:00 0.38 ---- 11.76 5938 12.32
06/26 08:00 0.03 ---- 11.74 5905 12.31
06/26 09:00 0.00 ---- 11.75 5921 13.03
06/26 10:00 0.00 ---- 11.75 5921 13.45
06/26 11:00 0.00 ---- 11.76 5938 13.57
06/26 12:00 0.00 ---- 11.76 5938 13.39
06/26 13:00 0.00 ---- 11.72 5872 13.06
06/26 14:00 0.00 ---- 11.68 5805 12.93
06/26 15:00 0.00 ---- 11.63 5723 12.79
06/26 16:00 0.00 ---- 11.60 5673 12.81
06/26 17:00 0.00 ---- 11.58 5640 12.78
06/26 18:00 0.00 ---- 11.56 5607 12.73
06/26 19:00 0.00 ---- 11.54 5575 12.65
06/26 20:00 0.00 ---- 11.53 5558 12.60
06/26 21:00 0.00 ---- 11.52 5542 12.54
06/26 22:00 0.00 ---- 11.48 5477 12.53
06/26 23:00 ---- ---- ---- ---- ----
Data processed at Thu 27Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.