PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/02 00:00 0.00 ---- 25.87 31934 12.44
05/02 01:00 0.00 ---- 25.71 31069 12.42
05/02 02:00 0.00 ---- 25.52 30099 12.39
05/02 03:00 0.00 ---- 25.34 29200 12.37
05/02 04:00 0.00 ---- 25.11 28323 12.36
05/02 05:00 0.00 ---- 24.85 27599 12.35
05/02 06:00 0.00 ---- 24.51 26773 12.34
05/02 07:00 0.00 ---- 24.10 26058 12.33
05/02 08:00 0.00 ---- 23.60 25203 12.35
05/02 09:00 0.00 ---- 22.99 24169 12.57
05/02 10:00 0.00 ---- 22.19 22819 12.77
05/02 11:00 0.00 ---- 21.34 21395 12.77
05/02 12:00 0.00 ---- 20.42 19864 13.30
05/02 13:00 0.00 ---- 19.52 18379 13.00
05/02 14:00 0.00 ---- 18.63 16922 13.20
05/02 15:00 0.01 ---- 17.76 15510 12.89
05/02 16:00 0.00 ---- 16.95 14208 12.89
05/02 17:00 0.00 ---- 16.72 13841 12.77
05/02 18:00 0.26 ---- 16.54 13554 12.57
05/02 19:00 0.08 ---- 16.34 13236 12.55
05/02 20:00 0.00 ---- 16.16 12950 12.49
05/02 21:00 0.00 ---- 15.96 12634 12.46
05/02 22:00 0.00 ---- 15.79 12365 12.44
05/02 23:00 0.00 ---- 15.60 12066 12.42
Data processed at Fri 03May2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.