PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/29 00:00 0.00 ---- 26.25 34171 12.31
04/29 01:00 0.00 ---- 26.42 35483 12.26
04/29 02:00 0.07 ---- 26.53 36352 12.26
04/29 03:00 0.00 ---- 26.62 37075 12.24
04/29 04:00 0.00 ---- 26.73 37973 12.24
04/29 05:00 0.00 ---- 26.81 38637 12.21
04/29 06:00 0.00 ---- 26.86 39057 12.21
04/29 07:00 0.00 ---- 26.92 39565 12.21
04/29 08:00 0.00 ---- 26.98 40078 12.24
04/29 09:00 0.00 ---- 27.02 40422 12.88
04/29 10:00 0.00 ---- 27.06 40769 13.19
04/29 11:00 0.00 ---- 27.10 41119 13.45
04/29 12:00 0.00 ---- 27.12 41294 13.54
04/29 13:00 0.00 ---- 27.17 41736 13.42
04/29 14:00 0.00 ---- 27.16 41647 13.24
04/29 15:00 0.00 ---- 27.17 41736 13.05
04/29 16:00 0.00 ---- 27.20 42002 12.98
04/29 17:00 0.00 ---- 27.21 42091 12.90
04/29 18:00 0.00 ---- 27.20 42002 12.82
04/29 19:00 0.00 ---- 27.23 42270 12.64
04/29 20:00 0.00 ---- 27.21 42091 12.59
04/29 21:00 0.00 ---- 27.22 42181 12.55
04/29 22:00 0.00 ---- 27.24 42360 12.51
04/29 23:00 0.00 ---- 27.24 42360 12.48
Data processed at Tue 30Apr2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.