PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/27 00:00 0.00 ---- 15.17 11392 12.44
04/27 01:00 0.00 ---- 15.55 11988 12.42
04/27 02:00 0.00 ---- 15.85 12460 12.40
04/27 03:00 0.00 ---- 16.10 12855 12.37
04/27 04:00 0.00 ---- 16.31 13188 12.36
04/27 05:00 0.00 ---- 16.49 13474 12.34
04/27 06:00 0.00 ---- 16.61 13665 12.32
04/27 07:00 0.00 ---- 16.70 13809 12.30
04/27 08:00 0.00 ---- 16.74 13873 12.30
04/27 09:00 0.00 ---- 16.74 13873 12.35
04/27 10:00 0.00 ---- 16.73 13857 12.46
04/27 11:00 0.00 ---- 16.71 13825 12.67
04/27 12:00 0.00 ---- 16.58 13618 13.07
04/27 13:00 0.00 ---- 16.44 13395 13.15
04/27 14:00 0.00 ---- 16.31 13188 13.24
04/27 15:00 0.00 ---- 16.08 12824 13.03
04/27 16:00 0.00 ---- 15.83 12429 13.04
04/27 17:00 0.00 ---- 15.79 12365 12.67
04/27 18:00 0.00 ---- 15.72 12255 12.56
04/27 19:00 0.00 ---- 15.64 12129 12.53
04/27 20:00 0.00 ---- 15.58 12035 12.50
04/27 21:00 0.00 ---- 15.52 11940 12.48
04/27 22:00 0.00 ---- 15.48 11878 12.45
04/27 23:00 0.00 ---- 15.37 11705 12.43
Data processed at Sun 28Apr2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.