PPFK1: Grand River, Parsons, KS

                                
SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:  
Regulating: Stage =    19.00, Flow =    17526

               PRECIP ELEVATION     STAGE  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/11 00:00      0.00      ----      7.88       606     12.40
08/11 01:00      0.00      ----      7.85       580     12.39
08/11 02:00      0.00      ----      7.83       562     12.36
08/11 03:00      0.00      ----      7.80       537     12.35
08/11 04:00      0.00      ----      7.77       513     12.33
08/11 05:00      0.00      ----      7.75       497     12.31
08/11 06:00      0.00      ----      7.72       474     12.30
08/11 07:00      0.00      ----      7.70       460     12.27
08/11 08:00      0.00      ----      7.68       445     12.31
08/11 09:00      0.00      ----      7.65       424     12.91
08/11 10:00      0.00      ----      7.64       416     13.19
08/11 11:00      0.00      ----      7.62       400     13.26
08/11 12:00      0.00      ----      7.61       392     12.83
08/11 13:00      0.00      ----      7.60       384     12.75
08/11 14:00      0.00      ----      7.58       369     12.73
08/11 15:00      0.00      ----      7.57       362     12.68
08/11 16:00      0.00      ----      7.55       347     12.66
08/11 17:00      0.00      ----      7.54       340     12.63
08/11 18:00      0.00      ----      7.51       320     12.63
08/11 19:00      0.00      ----      7.51       320     12.60
08/11 20:00      0.00      ----      7.50       313     12.52
08/11 21:00      0.00      ----      7.49       307     12.49
08/11 22:00      0.00      ----      7.46       288     12.46
08/11 23:00      0.00      ----      7.45       282     12.45

                            
Data processed at Sat 12Aug2023 04:45 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.