Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/04 00:00 12.17 12.30 414 0.10 12.49 09/04 01:00 12.22 12.29 0 -0.15 12.48 09/04 02:00 12.23 12.31 912 0.22 12.47 09/04 03:00 12.18 12.25 373 0.09 12.47 09/04 04:00 12.17 12.24 0 -0.09 12.46 09/04 05:00 12.17 12.24 0 -0.02 12.44 09/04 06:00 12.18 12.24 1202 0.29 12.44 09/04 07:00 12.16 12.23 622 0.15 12.44 09/04 08:00 12.13 12.23 249 0.06 12.44 09/04 09:00 12.30 12.46 1782 0.43 12.71 09/04 10:00 12.11 12.21 1990 0.48 12.86 09/04 11:00 12.16 12.24 249 0.06 12.70 09/04 12:00 12.11 12.21 705 0.17 12.63 09/04 13:00 12.14 12.22 663 0.16 12.65 09/04 14:00 12.07 12.14 1243 0.30 12.64 09/04 15:00 12.08 12.14 746 0.18 12.61 09/04 16:00 12.09 12.18 332 0.08 12.59 09/04 17:00 12.05 12.13 124 0.03 12.57 09/04 18:00 12.05 12.13 539 0.13 12.55 09/04 19:00 12.03 12.12 705 0.17 12.54 09/04 20:00 12.05 12.12 746 0.18 12.53 09/04 21:00 12.03 12.12 829 0.20 12.51 09/04 22:00 11.98 12.10 705 0.17 12.50 09/04 23:00 12.05 12.11 0 -0.03 12.50