Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/31 00:00 12.08 12.14 0 -0.02 12.50 08/31 01:00 12.08 12.15 83 0.02 12.49 08/31 02:00 12.09 12.15 166 0.04 12.48 08/31 03:00 12.11 12.21 456 0.11 12.47 08/31 04:00 12.10 12.16 0 -0.05 12.46 08/31 05:00 12.10 12.19 290 0.07 12.46 08/31 06:00 12.09 12.15 166 0.04 12.46 08/31 07:00 12.10 12.17 249 0.06 12.44 08/31 08:00 12.09 12.15 539 0.13 12.44 08/31 09:00 12.08 12.15 995 0.24 12.68 08/31 10:00 12.08 12.15 622 0.15 12.80 08/31 11:00 12.08 12.15 995 0.24 12.67 08/31 12:00 12.07 12.14 622 0.15 12.63 08/31 13:00 12.07 12.14 373 0.09 12.60 08/31 14:00 11.98 12.09 1326 0.32 12.60 08/31 15:00 12.06 12.13 580 0.14 12.59 08/31 16:00 12.03 12.12 829 0.20 12.57 08/31 17:00 12.03 12.12 207 0.05 12.56 08/31 18:00 12.05 12.13 207 0.05 12.54 08/31 19:00 12.06 12.14 249 0.06 12.53 08/31 20:00 12.08 12.15 456 0.11 12.53 08/31 21:00 12.08 12.13 166 0.04 12.51 08/31 22:00 12.10 12.21 249 0.06 12.51 08/31 23:00 12.09 12.20 414 0.10 12.50