Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/03 00:00 12.22 12.30 290 0.07 12.50 08/03 01:00 12.23 12.31 0 -0.04 12.49 08/03 02:00 12.24 12.32 746 0.18 12.48 08/03 03:00 12.24 12.32 622 0.15 12.47 08/03 04:00 12.28 12.37 249 0.06 12.47 08/03 05:00 12.22 12.30 207 0.05 12.47 08/03 06:00 12.26 12.34 0 -0.10 12.45 08/03 07:00 12.22 12.30 1078 0.26 12.45 08/03 08:00 12.22 12.28 373 0.09 12.45 08/03 09:00 12.22 12.32 788 0.19 12.67 08/03 10:00 12.20 12.28 1161 0.28 12.75 08/03 11:00 12.21 12.28 290 0.07 12.65 08/03 12:00 12.21 12.28 0 -0.02 12.64 08/03 13:00 12.22 12.29 0 -0.01 12.63 08/03 14:00 12.20 12.27 0 -0.11 12.62 08/03 15:00 12.19 12.27 0 -0.14 12.60 08/03 16:00 12.19 12.27 0 -0.29 12.58 08/03 17:00 12.15 12.25 249 0.06 12.54 08/03 18:00 12.15 12.23 0 -0.14 12.54 08/03 19:00 12.15 12.25 0 -0.12 12.54 08/03 20:00 12.14 12.23 0 -0.10 12.53 08/03 21:00 12.14 12.23 0 -0.06 12.50 08/03 22:00 12.14 12.23 249 0.06 12.51 08/03 23:00 12.12 12.22 373 0.09 12.50