Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 05/20 00:00 14.48 13.90 20778 5.56 12.50 05/20 01:00 14.47 13.89 20814 5.57 12.48 05/20 02:00 14.47 13.89 20528 5.49 12.47 05/20 03:00 14.44 13.90 20992 5.62 12.47 05/20 04:00 14.43 13.88 20635 5.52 12.46 05/20 05:00 14.52 13.88 20885 5.59 12.46 05/20 06:00 14.42 13.88 20671 5.53 12.45 05/20 07:00 14.39 13.88 20814 5.57 12.45 05/20 08:00 14.42 13.86 20671 5.53 12.48 05/20 09:00 14.40 13.86 20135 5.38 12.67 05/20 10:00 14.38 13.86 20528 5.49 12.79 05/20 11:00 14.38 13.85 20350 5.44 12.63 05/20 12:00 14.29 13.83 20671 5.53 12.67 05/20 13:00 14.46 13.75 20421 5.46 12.67 05/20 14:00 14.40 13.85 20778 5.56 12.58 05/20 15:00 14.42 13.84 21064 5.64 12.63 05/20 16:00 14.47 13.83 20778 5.56 12.58 05/20 17:00 14.43 13.84 20564 5.50 12.57 05/20 18:00 14.42 13.84 20385 5.45 12.56 05/20 19:00 14.36 13.84 20207 5.40 12.56 05/20 20:00 14.39 13.86 20956 5.61 12.54 05/20 21:00 14.42 13.86 20778 5.56 12.51 05/20 22:00 14.30 13.88 21242 5.69 12.50 05/20 23:00 14.41 13.87 20635 5.52 12.50