05/20 00:00 14.48 13.90 20778 5.56 12.50
05/20 01:00 14.47 13.89 20814 5.57 12.48
05/20 02:00 14.47 13.89 20528 5.49 12.47
05/20 03:00 14.44 13.90 20992 5.62 12.47
05/20 04:00 14.43 13.88 20635 5.52 12.46
05/20 05:00 14.52 13.88 20885 5.59 12.46
05/20 06:00 14.42 13.88 20671 5.53 12.45
05/20 07:00 14.39 13.88 20814 5.57 12.45
05/20 08:00 14.42 13.86 20671 5.53 12.48
05/20 09:00 14.40 13.86 20135 5.38 12.67
05/20 10:00 14.38 13.86 20528 5.49 12.79
05/20 11:00 14.38 13.85 20350 5.44 12.63
05/20 12:00 14.29 13.83 20671 5.53 12.67
05/20 13:00 14.46 13.75 20421 5.46 12.67
05/20 14:00 14.40 13.85 20778 5.56 12.58
05/20 15:00 14.42 13.84 21064 5.64 12.63
05/20 16:00 14.47 13.83 20778 5.56 12.58
05/20 17:00 14.43 13.84 20564 5.50 12.57
05/20 18:00 14.42 13.84 20385 5.45 12.56
05/20 19:00 14.36 13.84 20207 5.40 12.56
05/20 20:00 14.39 13.86 20956 5.61 12.54
05/20 21:00 14.42 13.86 20778 5.56 12.51
05/20 22:00 14.30 13.88 21242 5.69 12.50
05/20 23:00 14.41 13.87 20635 5.52 12.50