Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/19 00:00 12.22 12.27 1782 0.43 12.42 03/19 01:00 12.23 12.27 1202 0.29 12.40 03/19 02:00 12.22 12.27 1865 0.45 12.40 03/19 03:00 12.22 12.27 1534 0.37 12.37 03/19 04:00 12.22 12.27 1617 0.39 12.36 03/19 05:00 12.24 12.27 1243 0.30 12.35 03/19 06:00 12.22 12.26 829 0.20 12.34 03/19 07:00 12.24 12.27 1699 0.41 12.34 03/19 08:00 12.25 12.30 2197 0.53 12.34 03/19 09:00 12.23 12.27 1865 0.45 12.77 03/19 10:00 12.19 12.24 2984 0.72 13.03 03/19 11:00 12.22 12.26 2819 0.68 12.91 03/19 12:00 12.20 12.24 2155 0.52 12.84 03/19 13:00 12.21 12.26 2528 0.61 12.78 03/19 14:00 12.17 12.23 2984 0.72 12.73 03/19 15:00 12.19 12.24 2736 0.66 12.69 03/19 16:00 12.21 12.26 2155 0.52 12.65 03/19 17:00 12.18 12.24 2072 0.50 12.61 03/19 18:00 12.16 12.23 2072 0.50 12.58 03/19 19:00 12.15 12.20 1658 0.40 12.56 03/19 20:00 12.11 12.19 1699 0.41 12.53 03/19 21:00 12.16 12.16 829 0.20 12.50 03/19 22:00 12.10 12.14 1409 0.34 12.50 03/19 23:00 12.10 12.14 2114 0.51 12.47