Upstream stations:
Downstream station:
    
SHEF ID:       PODO2     Hwy 51
STATION TYPE:  
                STAGE  STAGE(2)  RIV-FLOW FLOW-INDX  BAT-LOAD
                   ft        ft       cfs      ft/s      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
03/17 00:00     12.09     12.14       870      0.21     12.46
03/17 01:00     12.09     12.15      1285      0.31     12.46
03/17 02:00     12.08     12.14      1451      0.35     12.44
03/17 03:00     12.10     12.15      1865      0.45     12.44
03/17 04:00     12.09     12.14      1243      0.30     12.44
03/17 05:00     12.06     12.10      1036      0.25     12.43
03/17 06:00     12.08     12.13      1699      0.41     12.43
03/17 07:00     12.05     12.09      1782      0.43     12.42
03/17 08:00     12.10     12.15      1326      0.32     12.41
03/17 09:00     12.15     12.20      1119      0.27     12.52
03/17 10:00     12.11     12.13      1451      0.35     12.95
03/17 11:00     12.09     12.12      1368      0.33     12.74
03/17 12:00     12.08     12.13      1534      0.37     12.70
03/17 13:00     12.09     12.12      1036      0.25     12.67
03/17 14:00     12.06     12.10      1285      0.31     12.67
03/17 15:00     12.04     12.08       788      0.19     12.63
03/17 16:00     12.05     12.09      1409      0.34     12.59
03/17 17:00     12.02     12.05      1492      0.36     12.57
03/17 18:00     11.94     12.00      1824      0.44     12.55
03/17 19:00     12.01     12.05      1492      0.36     12.53
03/17 20:00     12.03     12.12      1699      0.41     12.50
03/17 21:00     11.94     12.02      1492      0.36     12.49
03/17 22:00     11.99     12.03      1119      0.27     12.49
03/17 23:00     11.97     12.02      1326      0.32     12.48