Upstream stations:
Downstream station:
    
SHEF ID:       PODO2     Hwy 51
STATION TYPE:  
                STAGE  STAGE(2)  RIV-FLOW FLOW-INDX  BAT-LOAD
                   ft        ft       cfs      ft/s      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
03/14 00:00     12.20     12.25         0     -0.02     12.45
03/14 01:00     12.21     12.26         0     -0.10     12.44
03/14 02:00     12.20     12.26         0     -0.18     12.43
03/14 03:00     12.21     12.26         0     -0.20     12.42
03/14 04:00     12.20     12.25         0     -0.16     12.40
03/14 05:00     12.20     12.26         0     -0.08     12.40
03/14 06:00     12.21     12.25         0     -0.03     12.40
03/14 07:00     12.19     12.24         0     -0.07     12.40
03/14 08:00     12.20     12.25         0     -0.07     12.37
03/14 09:00     12.18     12.24         0     -0.11     12.37
03/14 10:00     12.21     12.24       124      0.03     12.44
03/14 11:00     12.19     12.23         0     -0.05     12.49
03/14 12:00     12.19     12.22         0     -0.15     12.48
03/14 13:00     12.20     12.23         0     -0.08     12.61
03/14 14:00     12.20     12.23         0     -0.05     12.61
03/14 15:00     12.18     12.22       207      0.05     12.62
03/14 16:00     12.17     12.23         0     -0.12     12.58
03/14 17:00     12.18     12.23         0     -0.02     12.53
03/14 18:00     12.21     12.26       456      0.11     12.53
03/14 19:00     12.21     12.25       580      0.14     12.48
03/14 20:00     12.21     12.25      1368      0.33     12.44
03/14 21:00     12.18     12.25      1368      0.33     12.44
03/14 22:00     12.19     12.25      2072      0.50     12.43
03/14 23:00     12.18     12.24      2528      0.61     12.42