Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/14 00:00 12.20 12.25 0 -0.02 12.45 03/14 01:00 12.21 12.26 0 -0.10 12.44 03/14 02:00 12.20 12.26 0 -0.18 12.43 03/14 03:00 12.21 12.26 0 -0.20 12.42 03/14 04:00 12.20 12.25 0 -0.16 12.40 03/14 05:00 12.20 12.26 0 -0.08 12.40 03/14 06:00 12.21 12.25 0 -0.03 12.40 03/14 07:00 12.19 12.24 0 -0.07 12.40 03/14 08:00 12.20 12.25 0 -0.07 12.37 03/14 09:00 12.18 12.24 0 -0.11 12.37 03/14 10:00 12.21 12.24 124 0.03 12.44 03/14 11:00 12.19 12.23 0 -0.05 12.49 03/14 12:00 12.19 12.22 0 -0.15 12.48 03/14 13:00 12.20 12.23 0 -0.08 12.61 03/14 14:00 12.20 12.23 0 -0.05 12.61 03/14 15:00 12.18 12.22 207 0.05 12.62 03/14 16:00 12.17 12.23 0 -0.12 12.58 03/14 17:00 12.18 12.23 0 -0.02 12.53 03/14 18:00 12.21 12.26 456 0.11 12.53 03/14 19:00 12.21 12.25 580 0.14 12.48 03/14 20:00 12.21 12.25 1368 0.33 12.44 03/14 21:00 12.18 12.25 1368 0.33 12.44 03/14 22:00 12.19 12.25 2072 0.50 12.43 03/14 23:00 12.18 12.24 2528 0.61 12.42