Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/26 00:00 12.17 12.22 332 0.08 12.42 10/26 01:00 12.15 12.21 373 0.09 12.42 10/26 02:00 12.16 12.22 0 -0.05 12.40 10/26 03:00 12.16 12.22 166 0.04 12.40 10/26 04:00 12.17 12.22 414 0.10 12.39 10/26 05:00 12.15 12.21 124 0.03 12.37 10/26 06:00 12.22 12.29 414 0.10 12.37 10/26 07:00 12.20 12.25 0 -0.08 12.36 10/26 08:00 12.15 12.21 207 0.05 12.36 10/26 09:00 12.19 12.24 0 -0.05 12.37 10/26 10:00 12.18 12.22 0 -0.19 12.43 10/26 11:00 12.19 8.66 0 -0.11 12.55 10/26 12:00 12.19 12.24 0 -0.10 12.90 10/26 13:00 12.20 12.25 0 -0.12 12.71 10/26 14:00 12.19 12.24 0 -0.06 12.67 10/26 15:00 12.21 12.26 0 -0.03 12.61 10/26 16:00 12.21 12.26 0 -0.08 12.60 10/26 17:00 12.21 12.27 249 0.06 12.55 10/26 18:00 12.23 12.27 0 -0.03 12.53 10/26 19:00 12.20 12.27 0 0.00 12.49 10/26 20:00 12.21 12.28 663 0.16 12.47 10/26 21:00 12.14 12.22 539 0.13 12.46 10/26 22:00 12.26 12.26 829 0.20 12.45 10/26 23:00 12.30 12.34 0 -0.13 12.44