Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX BAT-LOAD ft ft cfs ft/s volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/05 00:00 12.20 12.31 373 0.09 12.45 10/05 01:00 12.19 12.26 456 0.11 12.44 10/05 02:00 12.23 12.32 166 0.04 12.43 10/05 03:00 12.20 12.23 663 0.16 12.42 10/05 04:00 12.20 12.27 124 0.03 12.41 10/05 05:00 12.21 12.26 0 -0.08 12.40 10/05 06:00 12.21 12.27 373 0.09 12.40 10/05 07:00 12.21 12.26 456 0.11 12.39 10/05 08:00 12.21 12.27 166 0.04 12.37 10/05 09:00 12.21 12.28 414 0.10 12.62 10/05 10:00 12.20 12.25 539 0.13 12.90 10/05 11:00 12.30 12.33 1699 0.41 12.70 10/05 12:00 12.18 12.24 414 0.10 12.67 10/05 13:00 12.21 12.29 829 0.20 12.63 10/05 14:00 12.19 12.24 746 0.18 12.61 10/05 15:00 12.24 12.28 1078 0.26 12.59 10/05 16:00 12.19 12.26 249 0.06 12.56 10/05 17:00 12.26 12.32 912 0.22 12.53 10/05 18:00 12.21 12.26 953 0.23 12.50 10/05 19:00 12.18 12.26 580 0.14 12.48 10/05 20:00 12.20 12.25 1285 0.31 12.47 10/05 21:00 12.17 12.31 663 0.16 12.47 10/05 22:00 12.19 12.24 166 0.04 12.46 10/05 23:00 12.19 12.25 373 0.09 12.45