Upstream stations:
Downstream station:SHEF ID: PODO2 Hwy 51 STATION TYPE: STAGE STAGE(2) RIV-FLOW FLOW-INDX FLOW-VEL WTR-TEMP VOLTAGE BAT-LOAD ft ft cfs ft/s mph F volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/13 00:00 12.15 12.22 5720 1.38 ---- ---- ---- 12.47 09/13 01:00 12.14 12.22 5388 1.30 ---- ---- ---- 12.46 09/13 02:00 12.15 12.22 5347 1.29 ---- ---- ---- 12.46 09/13 03:00 12.14 12.22 5513 1.33 ---- ---- ---- 12.45 09/13 04:00 12.15 12.22 5223 1.26 ---- ---- ---- 12.44 09/13 05:00 12.15 12.22 4891 1.18 ---- ---- ---- 12.44 09/13 06:00 12.15 12.22 5306 1.28 ---- ---- ---- 12.44 09/13 07:00 12.15 12.22 5637 1.36 ---- ---- ---- 12.43 09/13 08:00 12.15 12.22 5471 1.32 ---- ---- ---- 12.42 09/13 09:00 12.15 12.22 5306 1.28 ---- ---- ---- 12.57 09/13 10:00 12.16 12.22 5596 1.35 ---- ---- ---- 12.83 09/13 11:00 12.16 12.22 5306 1.28 ---- ---- ---- 12.67 09/13 12:00 12.15 12.21 5886 1.42 ---- ---- ---- 12.65 09/13 13:00 12.18 12.23 5969 1.44 ---- ---- ---- 12.64 09/13 14:00 12.19 12.25 5720 1.38 ---- ---- ---- 12.62 09/13 15:00 12.20 12.26 6135 1.48 ---- ---- ---- 12.60 09/13 16:00 12.20 12.26 5844 1.41 ---- ---- ---- 12.57 09/13 17:00 12.20 12.26 5803 1.40 ---- ---- ---- 12.55 09/13 18:00 12.22 12.29 5471 1.32 ---- ---- ---- 12.53 09/13 19:00 12.20 12.27 5927 1.43 ---- ---- ---- 12.51 09/13 20:00 12.25 12.33 5596 1.35 ---- ---- ---- 12.50 09/13 21:00 12.26 12.34 6093 1.47 ---- ---- ---- 12.49 09/13 22:00 12.28 12.34 6929 1.68 ---- ---- ---- 12.49 09/13 23:00 12.27 12.33 6591 1.59 ---- ---- ---- 12.48