Upstream stations:
Downstream station:
SHEF ID: PECK1 NINNESCAH R NR PECK, KS
STATION TYPE:
Regulating: Stage = 12.00, Flow = 6713
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
01/22 00:00 0.00 2.76 115 12.65
01/22 01:00 0.00 2.75 112 12.65
01/22 02:00 0.00 2.77 118 12.57
01/22 03:00 0.00 2.80 127 12.57
01/22 04:00 0.00 2.82 133 12.57
01/22 05:00 0.00 2.83 136 12.49
01/22 06:00 0.00 2.83 136 12.49
01/22 07:00 0.00 2.83 136 12.41
01/22 08:00 0.00 2.85 143 12.41
01/22 09:00 0.00 2.86 146 12.41
01/22 10:00 0.00 2.86 146 12.65
01/22 11:00 0.00 2.81 130 13.84
01/22 12:00 0.00 2.77 118 14.00
01/22 13:00 0.00 2.81 130 13.92
01/22 14:00 0.00 2.87 149 13.76
01/22 15:00 0.00 2.94 171 13.60
01/22 16:00 0.00 2.99 188 13.53
01/22 17:00 0.00 3.00 191 ----
01/22 18:00 0.00 2.98 185 13.29
01/22 19:00 0.00 2.96 178 12.89
01/22 20:00 0.00 2.95 175 12.89
01/22 21:00 0.00 2.95 175 12.65
01/22 22:00 0.00 2.96 178 12.73
01/22 23:00 0.00 2.98 185 12.65