PCLO2: Pine Creek Lake

                                SHEF ID:       PCLO2     Pine Creek Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 438.00, Top = 480.00

PRECIP ELEVATION STORAGE TW-ELEV INFLOW RELEASE STAGE(2) AIR-TEMP WIND-DIRWIND-SPEED REL-HUMID SOLAR-RAD VOLTAGE BAT-LOAD
in ft ac-ft ft cfs cfs ft F deg mph % W/m2 volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/28 00:00 0.00 438.63 42546 383.38 41 41 ---- 62.76 55.50 3.20 71.76 0.00 13.14 12.25
03/28 01:00 0.00 438.64 42579 383.38 41 41 ---- 63.23 3.90 3.60 74.70 0.00 13.14 12.27
03/28 02:00 0.00 438.63 42546 383.38 120 41 ---- 63.12 119.40 2.40 69.70 0.00 13.15 12.27
03/28 03:00 0.00 438.63 42546 383.38 120 41 ---- 64.89 120.90 4.20 64.81 0.00 13.14 12.28
03/28 04:00 0.00 438.64 42579 383.38 577 41 ---- 64.06 131.10 6.00 74.97 0.00 13.14 12.32
03/28 05:00 0.01 438.64 42579 383.38 729 41 ---- 61.16 130.30 4.30 90.40 0.00 13.13 12.27
03/28 06:00 0.09 438.70 42773 383.38 1033 41 ---- 60.42 108.50 4.80 94.03 0.00 13.14 12.24
03/28 07:00 0.28 438.72 42838 383.38 955 41 ---- 60.26 110.60 6.00 95.79 0.00 13.14 12.20
03/28 08:00 0.40 438.76 42968 383.38 1031 41 ---- 60.33 128.90 8.70 97.28 0.00 13.14 12.28
03/28 09:00 0.17 438.76 42968 383.38 726 41 ---- 61.77 168.20 12.70 92.99 0.00 13.14 12.31
03/28 10:00 0.02 438.77 43000 383.37 650 41 ---- 61.52 121.90 5.70 96.36 66.10 13.54 12.27
03/28 11:00 0.02 438.79 43065 383.38 497 41 ---- 61.84 142.10 5.80 96.53 119.00 14.21 12.67
03/28 12:00 0.01 438.80 43098 383.38 489 41 ---- 62.85 136.60 5.20 95.95 140.50 14.22 12.67
03/28 13:00 0.00 438.82 43162 383.38 642 41 ---- 65.01 133.80 6.60 92.12 339.10 13.81 12.70
03/28 14:00 0.00 438.81 43130 383.38 565 41 ---- 67.66 134.60 8.70 83.38 470.70 13.77 12.71
03/28 15:00 0.00 438.84 43227 383.38 718 41 ---- 70.05 134.70 11.10 76.42 516.30 13.76 12.63
03/28 16:00 0.00 438.85 43260 383.38 565 41 ---- 70.20 138.10 10.00 73.59 291.60 13.75 12.60
03/28 17:00 0.00 438.88 43357 383.38 726 41 ---- 68.61 134.30 10.30 78.44 126.80 13.72 12.57
03/28 18:00 0.02 438.88 43357 383.38 574 41 ---- 66.02 116.80 6.70 92.52 64.60 13.38 12.59
03/28 19:00 0.04 438.90 43422 383.38 497 41 ---- 64.80 122.10 7.70 95.43 2.50 13.12 12.44
03/28 20:00 0.00 438.91 43454 383.38 345 41 ---- 63.72 137.90 6.50 95.19 0.00 13.14 12.07
03/28 21:00 0.00 438.92 43487 383.38 345 41 ---- 63.54 134.70 5.50 95.52 0.00 13.14 12.31
03/28 22:00 0.00 438.93 43519 383.38 345 42 ---- 63.79 151.90 6.10 95.06 0.00 13.14 12.24
03/28 23:00 0.00 438.93 43519 383.38 ---- ---- ---- 64.11 144.10 6.20 95.42 0.00 13.14 12.24
Data processed at Sat 29Mar2025 04:09 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PINE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PINE.Elev.Inst.1Hour.0.Ccp-Rev
PINE.Stor.Inst.1Hour.0.Ccp-Rev
PINE.Elev-Tailwater.Inst.1Hour.0.Ccp-Rev
PINE.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
PINE.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
PINE.Stage-Alt.Inst.1Hour.0.Ccp-Rev
PINE.Temp-Air.Inst.1Hour.0.Ccp-Rev
PINE.Dir-Wind.Inst.1Hour.0.Ccp-Rev
PINE.Speed-Wind.Inst.1Hour.0.Ccp-Rev
PINE.%-Humidity.Inst.1Hour.0.Ccp-Rev
PINE.Irrad.Inst.1Hour.0.Ccp-Rev
PINE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
PINE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.