PCLO2: Pine Creek Lake

                                SHEF ID:       PCLO2     Pine Creek Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 438.00, Top = 480.00

PRECIP ELEVATION STORAGE TW-ELEV INFLOW RELEASE STAGE(2) AIR-TEMP WIND-DIRWIND-SPEED REL-HUMID SOLAR-RAD VOLTAGE BAT-LOAD
in ft ac-ft ft cfs cfs ft F deg mph % W/m2 volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/08 00:00 0.00 439.71 46196 383.38 961 42 ---- 59.70 358.90 12.10 44.56 0.00 13.09 12.11
03/08 01:00 0.00 439.71 46196 383.38 710 42 ---- 57.78 357.60 12.50 47.06 0.00 13.09 12.14
03/08 02:00 0.00 439.74 46300 383.38 710 42 ---- 56.64 356.90 13.30 47.48 0.00 13.08 12.07
03/08 03:00 0.00 439.74 46300 383.38 543 42 ---- 55.69 354.90 9.80 48.39 0.00 13.08 12.11
03/08 04:00 0.00 439.76 46369 383.38 710 42 ---- 54.14 358.20 8.30 52.15 0.00 13.08 12.15
03/08 05:00 0.00 439.77 46403 383.38 541 42 ---- 53.28 357.80 6.20 53.25 0.00 13.08 11.81
03/08 06:00 0.00 439.79 46472 383.38 704 42 ---- 52.77 359.20 8.40 53.05 0.00 13.07 12.11
03/08 07:00 0.00 439.80 46507 383.37 781 42 ---- 51.85 18.90 6.40 54.60 0.00 13.07 12.11
03/08 08:00 0.00 439.82 46576 383.38 942 42 ---- 51.19 50.80 5.40 56.05 0.00 13.08 12.13
03/08 09:00 0.01 439.85 46679 383.38 856 42 ---- 50.40 14.70 6.70 63.16 11.30 13.06 12.09
03/08 10:00 0.04 439.88 46783 383.38 856 42 ---- 48.67 50.80 6.10 80.86 186.60 14.31 12.13
03/08 11:00 0.08 439.89 46817 383.38 1100 42 ---- 49.44 331.10 6.00 81.65 10.60 13.11 12.31
03/08 12:00 0.06 439.90 46852 383.38 1019 42 ---- 47.55 8.30 7.10 89.60 99.10 14.34 12.13
03/08 13:00 0.00 439.95 47024 383.38 766 42 ---- 47.91 4.70 10.80 87.35 114.90 13.40 12.68
03/08 14:00 0.08 439.97 47093 383.38 1011 42 ---- 47.32 351.00 11.50 90.14 45.50 13.41 12.32
03/08 15:00 0.00 439.96 47059 383.38 1187 42 ---- 47.82 7.00 13.50 86.11 68.80 13.49 12.50
03/08 16:00 0.09 440.00 47197 383.38 1210 42 ---- 48.36 342.30 8.10 87.08 16.30 13.04 12.27
03/08 17:00 0.07 440.03 47306 383.38 1047 42 ---- 47.37 20.20 2.90 96.20 19.20 13.06 12.06
03/08 18:00 0.08 440.08 47488 383.38 1227 42 ---- 47.61 298.50 4.70 96.86 1.60 13.06 12.11
03/08 19:00 0.05 440.08 47488 383.38 987 42 ---- 47.34 36.90 4.40 96.70 0.00 13.07 12.00
03/08 20:00 0.03 440.11 47598 383.38 901 42 ---- 46.58 18.80 7.50 93.29 0.00 13.07 11.87
03/08 21:00 0.00 440.13 47670 383.37 557 42 ---- 46.40 357.50 10.20 91.85 0.00 13.07 12.21
03/08 22:00 0.00 440.15 47743 383.38 815 42 ---- 46.15 8.70 7.70 90.40 0.00 13.06 12.18
03/08 23:00 0.00 440.15 47743 383.38 ---- ---- ---- 45.64 1.40 8.50 89.54 0.00 13.06 12.21
Data processed at Sun 09Mar2025 05:09 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PINE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PINE.Elev.Inst.1Hour.0.Ccp-Rev
PINE.Stor.Inst.1Hour.0.Ccp-Rev
PINE.Elev-Tailwater.Inst.1Hour.0.Ccp-Rev
PINE.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
PINE.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
PINE.Stage-Alt.Inst.1Hour.0.Ccp-Rev
PINE.Temp-Air.Inst.1Hour.0.Ccp-Rev
PINE.Dir-Wind.Inst.1Hour.0.Ccp-Rev
PINE.Speed-Wind.Inst.1Hour.0.Ccp-Rev
PINE.%-Humidity.Inst.1Hour.0.Ccp-Rev
PINE.Irrad.Inst.1Hour.0.Ccp-Rev
PINE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
PINE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.