Upstream stations:
Downstream station:
SHEF ID: NEDK1 Verdigris River, Neodesha Ks
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
08/09 00:00 0.00 9.60 5 12.73 12.65
08/09 01:00 0.00 9.59 5 12.73 12.65
08/09 02:00 0.00 9.59 5 12.73 12.65
08/09 03:00 0.00 9.60 5 12.73 12.65
08/09 04:00 0.00 9.59 5 12.65 12.65
08/09 05:00 0.00 9.59 5 12.65 12.65
08/09 06:00 0.00 9.59 5 12.65 12.65
08/09 07:00 0.00 9.59 5 12.65 12.57
08/09 08:00 0.00 9.59 5 12.73 12.65
08/09 09:00 0.00 9.59 5 13.05 12.81
08/09 10:00 0.00 9.60 5 13.21 13.05
08/09 11:00 0.00 9.60 5 13.21 13.05
08/09 12:00 0.00 9.60 5 13.21 13.05
08/09 13:00 0.00 9.60 5 14.08 13.05
08/09 14:00 0.00 9.61 6 13.53 13.21
08/09 15:00 0.00 9.62 6 13.44 12.97
08/09 16:00 0.00 9.61 6 13.05 12.89
08/09 17:00 0.00 9.61 6 12.97 12.81
08/09 18:00 0.00 9.62 6 12.89 12.81
08/09 19:00 0.00 9.61 6 12.81 12.81
08/09 20:00 0.00 9.61 6 12.81 12.73
08/09 21:00 0.00 9.60 5 12.81 12.73
08/09 22:00 0.00 9.59 5 12.73 12.65
08/09 23:00 0.00 9.58 5 12.73 12.65