Upstream stations:
Downstream station:
SHEF ID: NEDK1 Verdigris River, Neodesha Ks
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
08/06 00:00 0.00 9.68 9 12.73 12.65
08/06 01:00 0.00 9.68 9 12.73 12.65
08/06 02:00 0.00 9.68 9 12.73 12.65
08/06 03:00 0.00 9.68 9 12.73 12.65
08/06 04:00 0.00 9.68 9 12.65 12.65
08/06 05:00 0.00 9.68 9 12.65 12.65
08/06 06:00 0.00 9.69 9 12.65 12.65
08/06 07:00 0.00 9.68 9 12.65 12.57
08/06 08:00 0.00 9.69 9 12.81 12.65
08/06 09:00 0.00 9.68 9 13.13 12.97
08/06 10:00 0.00 9.69 9 13.29 13.13
08/06 11:00 0.00 9.70 10 13.60 13.05
08/06 12:00 0.00 9.69 9 13.68 13.05
08/06 13:00 0.00 9.69 9 13.84 12.97
08/06 14:00 0.00 9.69 9 13.84 12.97
08/06 15:00 0.00 9.68 9 13.29 12.97
08/06 16:00 0.00 9.67 8 13.84 12.89
08/06 17:00 0.00 9.69 9 13.05 12.81
08/06 18:00 0.00 9.68 9 12.81 12.81
08/06 19:00 0.00 9.67 8 12.81 12.73
08/06 20:00 0.00 9.66 8 12.81 12.73
08/06 21:00 0.00 9.66 8 12.81 12.73
08/06 22:00 0.00 9.65 7 12.73 12.73
08/06 23:00 ---- ---- ---- ---- ----