Upstream stations:
Downstream station:
SHEF ID: NEDK1 Verdigris River, Neodesha Ks
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
06/20 00:00 0.00 14.59 1243 12.73 12.65
06/20 01:00 0.00 14.59 1243 12.73 12.65
06/20 02:00 0.00 14.58 1239 12.73 12.65
06/20 03:00 0.00 14.58 1239 12.65 12.65
06/20 04:00 0.00 14.57 1234 12.65 12.65
06/20 05:00 0.00 14.57 1234 12.65 12.65
06/20 06:00 0.00 14.58 1239 12.65 12.57
06/20 07:00 0.00 14.57 1234 12.65 12.57
06/20 08:00 0.00 14.57 1234 12.65 12.65
06/20 09:00 0.00 14.58 1239 13.13 12.89
06/20 10:00 0.00 14.58 1239 13.29 13.13
06/20 11:00 0.00 14.58 1239 13.76 13.05
06/20 12:00 0.00 14.58 1239 13.84 12.97
06/20 13:00 0.00 14.59 1243 13.92 13.05
06/20 14:00 0.00 14.58 1239 14.00 12.97
06/20 15:00 0.00 14.58 1239 13.76 12.89
06/20 16:00 0.00 14.59 1243 14.24 12.89
06/20 17:00 0.00 14.59 1243 12.97 12.81
06/20 18:00 0.00 14.59 1243 12.81 12.81
06/20 19:00 0.00 14.58 1239 12.81 12.73
06/20 20:00 0.00 14.58 1239 12.81 12.73
06/20 21:00 0.00 14.57 1234 12.73 12.73
06/20 22:00 0.00 14.57 1234 12.73 12.65
06/20 23:00 0.00 14.57 1234 12.73 12.65