Upstream stations:
Downstream station:SHEF ID: NEDK1 Verdigris River, Neodesha Ks STATION TYPE: PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/08 00:00 0.00 17.03 2445 12.65 12.65 09/08 01:00 0.00 17.04 2450 12.65 12.65 09/08 02:00 0.00 17.11 2485 12.65 12.57 09/08 03:00 0.00 17.21 2537 12.65 12.57 09/08 04:00 0.00 17.33 2599 12.65 12.57 09/08 05:00 0.00 17.50 2688 12.65 12.57 09/08 06:00 0.00 17.65 2767 12.65 12.57 09/08 07:00 0.00 17.82 2858 12.65 12.57 09/08 08:00 0.00 18.02 2966 12.73 12.57 09/08 09:00 0.00 18.23 3071 13.21 12.97 09/08 10:00 0.00 18.45 3175 13.84 13.05 09/08 11:00 0.00 18.67 3280 14.16 13.05 09/08 12:00 0.00 18.90 3391 13.68 13.05 09/08 13:00 0.00 19.07 3473 13.53 13.05 09/08 14:00 0.00 19.22 3550 13.76 13.05 09/08 15:00 0.00 19.39 3645 13.84 12.89 09/08 16:00 0.00 19.51 3712 13.92 12.89 09/08 17:00 0.00 19.65 3791 13.53 12.81 09/08 18:00 0.00 19.72 3831 12.81 12.73 09/08 19:00 0.00 19.85 3906 12.73 12.73 09/08 20:00 0.00 19.91 3940 12.73 12.65 09/08 21:00 0.00 20.00 3992 12.73 12.65 09/08 22:00 0.00 20.06 4027 12.73 12.65 09/08 23:00 0.00 20.12 4061 12.65 12.65