Upstream stations:
Downstream station:
    
SHEF ID:       NEDK1     Verdigris River, Neodesha Ks
STATION TYPE:  
               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/08 00:00      0.00     10.10        78     12.65     12.65
08/08 01:00      0.00     10.11        80     12.65     12.65
08/08 02:00      0.00     10.11        80     12.65     12.57
08/08 03:00      0.00     10.11        80     12.65     12.57
08/08 04:00      0.18     10.08        72     12.65     12.57
08/08 05:00      0.42     10.14        90     12.65     12.57
08/08 06:00      0.00     10.19       101     12.65     12.57
08/08 07:00      0.00     10.24       108     12.65     12.57
08/08 08:00      0.00     10.40       134     12.65     12.57
08/08 09:00      0.00     10.58       163     12.73     12.65
08/08 10:00      0.00     10.85       209     12.81     12.65
08/08 11:00      0.00     11.05       245     13.21     12.97
08/08 12:00      0.00     11.16       265     13.68     12.97
08/08 13:00      0.00     11.15       263     13.84     12.97
08/08 14:00      0.00     11.11       256     14.08     12.97
08/08 15:00      0.00     11.02       239     14.00     12.81
08/08 16:00      0.00     10.95       227     13.84     12.81
08/08 17:00      0.00     11.10       254     12.81     12.73
08/08 18:00      0.00     11.49       326     12.81     12.73
08/08 19:00      0.00     11.97       440     12.81     12.73
08/08 20:00      0.00     12.37       541     12.73     12.65
08/08 21:00      0.00     12.60       603     12.73     12.65
08/08 22:00      0.00     12.68       625     12.73     12.65
08/08 23:00      0.00     12.66       619     12.65     12.65