Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
08/02 00:00 0.00 1405.85 66774 0 0 12.65 12.57
08/02 01:00 0.00 1405.85 66774 0 0 12.65 12.49
08/02 02:00 0.00 1405.85 66774 0 0 12.65 12.49
08/02 03:00 0.00 1405.85 66774 0 0 12.65 12.49
08/02 04:00 0.00 1405.85 66774 0 0 12.65 12.49
08/02 05:00 0.00 1405.85 66774 0 0 12.65 12.49
08/02 06:00 0.00 1405.85 66774 0 0 12.65 12.41
08/02 07:00 0.00 1405.85 66774 0 0 12.65 12.41
08/02 08:00 0.00 1405.85 66774 0 0 12.65 12.41
08/02 09:00 0.00 1405.84 66719 0 0 13.05 12.65
08/02 10:00 0.00 1405.85 66774 0 0 13.29 13.05
08/02 11:00 0.00 1405.85 66774 0 0 13.53 13.05
08/02 12:00 0.00 1405.85 66774 0 0 13.29 13.13
08/02 13:00 0.00 1405.85 66774 0 0 13.37 13.37
08/02 14:00 0.00 1405.84 66719 0 0 13.53 12.97
08/02 15:00 0.00 1405.84 66719 0 0 13.84 13.53
08/02 16:00 0.00 1405.84 66719 0 0 13.76 13.21
08/02 17:00 0.00 1405.84 66719 0 0 13.29 12.97
08/02 18:00 0.00 1405.84 66719 0 0 13.44 12.81
08/02 19:00 0.00 1405.84 66719 0 0 13.92 12.73
08/02 20:00 0.00 1405.83 66664 0 0 12.97 12.65
08/02 21:00 0.00 1405.83 66664 0 0 12.73 12.57
08/02 22:00 0.00 1405.83 66664 0 0 12.73 12.57
08/02 23:00 0.00 1405.83 66664 0 0 12.65 12.57