07/22 00:00 0.00 1406.21 68773 0 0 12.65 12.49
07/22 01:00 0.00 1406.21 68773 0 0 12.65 12.49
07/22 02:00 0.00 1406.20 68717 0 0 12.65 12.49
07/22 03:00 0.00 1406.20 68717 0 0 12.65 12.49
07/22 04:00 0.00 1406.20 68717 0 0 12.65 12.49
07/22 05:00 0.00 1406.20 68717 0 0 12.65 12.41
07/22 06:00 0.00 1406.20 68717 0 0 12.65 12.41
07/22 07:00 0.00 1406.19 68661 0 0 12.57 12.41
07/22 08:00 0.00 1406.19 68661 0 0 12.65 12.41
07/22 09:00 0.00 1406.19 68661 0 0 12.73 12.49
07/22 10:00 0.00 1406.19 68661 0 0 12.89 12.57
07/22 11:00 0.00 1406.20 68717 0 0 13.76 13.05
07/22 12:00 0.00 1406.19 68661 0 0 14.00 13.13
07/22 13:00 0.00 1406.19 68661 0 0 13.68 13.05
07/22 14:00 0.00 1406.19 68661 0 0 13.29 13.68
07/22 15:00 0.00 1406.19 68661 0 0 14.00 13.60
07/22 16:00 0.00 1406.18 68605 0 0 13.44 13.44
07/22 17:00 0.00 1406.19 68661 0 0 13.84 12.81
07/22 18:00 0.00 1406.18 68605 0 0 13.60 12.97
07/22 19:00 0.00 1406.18 68605 0 0 13.29 12.73
07/22 20:00 0.00 1406.18 68605 0 0 13.29 12.65
07/22 21:00 0.00 1406.18 68605 0 0 12.73 12.57
07/22 22:00 0.00 1406.18 68605 0 0 12.73 12.57
07/22 23:00 0.00 1406.18 68605 0 0 12.65 12.57