Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
06/30 00:00 0.00 1406.90 72711 0 0 12.65 12.57
06/30 01:00 0.00 1406.90 72711 0 0 12.65 12.49
06/30 02:00 0.00 1406.90 72711 0 0 12.65 12.49
06/30 03:00 0.00 1406.90 72711 0 0 12.65 12.49
06/30 04:00 0.00 1406.90 72711 0 0 12.65 12.49
06/30 05:00 0.00 1406.89 72653 0 0 12.65 12.41
06/30 06:00 0.00 1406.89 72653 0 0 12.57 12.41
06/30 07:00 0.00 1406.89 72653 0 0 12.57 12.41
06/30 08:00 0.00 1406.89 72653 0 0 12.65 12.41
06/30 09:00 0.00 1406.89 72653 0 0 12.81 12.49
06/30 10:00 0.00 1406.89 72653 0 0 13.37 12.97
06/30 11:00 0.00 1406.89 72653 0 0 13.29 13.13
06/30 12:00 0.00 1406.89 72653 0 0 14.00 13.29
06/30 13:00 0.00 1406.89 72653 0 0 13.76 13.60
06/30 14:00 0.00 1406.89 72653 0 0 13.76 13.29
06/30 15:00 0.00 1406.89 72653 0 0 13.21 13.13
06/30 16:00 0.00 1406.89 72653 0 0 13.60 13.84
06/30 17:00 0.00 1406.89 72653 0 0 13.84 12.97
06/30 18:00 0.00 1406.88 72596 0 0 13.92 12.73
06/30 19:00 0.00 1406.88 72596 0 0 13.29 12.73
06/30 20:00 0.00 1406.88 72596 0 0 13.37 12.65
06/30 21:00 0.00 1406.87 72538 0 0 12.73 12.57
06/30 22:00 0.00 1406.87 72538 0 0 12.73 12.57
06/30 23:00 0.00 1406.87 72538 0 0 12.65 12.57